Abstraction of quantities
During the estimation process in construction, estimators will carry undertake a process referred to as ‘taking off’. This refers to the process of identifying elements of construction works that can be measured and priced, and it is necessary to produce bills of quantities. Bills of quantities are issued to tenderers for them to prepare a price for carrying out the works described.
The elements can be measured in number, length, area, volume, weight or time.
Abstraction is the process of collating all the quantities ‘taken off’ into a single total for each element that can then be transferred into the bill of quantities.
Quantities of the same items are captured on dimension/abstraction sheets. For example, to capture of all quantities for facing brickwork, the estimator will start to measure the brickwork on drawings. They will generally measure the area of the wall and also capture the areas for windows and doors or any other features that will impact on the quantity of the facing brickwork area. As part of the abstraction, they will also round up figures. The estimator will then have a final quantity for all the facing brickwork that will be used in the bill of quantities.
The estimator will generally follow the ‘New rules of measurement’ as set out by the Royal Institute of Chartered Surveyors (RICS) to capture quantities for the abstraction. Depending on the project they will use one of the following standards:
- NRM1: Order of cost estimating and cost planning for capital building works.
- NRM2: Detailed measurement for building works.
- NRM3 - Order of cost estimating and cost planning for building maintenance works.
The rules of measurement will guide the estimator on the unit that has to be calculated for each element. For facing brickwork, the rules state that the unit applicable will be m2.
Typical units classified in the New rules of measurement are:
The rules will also guide the estimator on which areas of measurements to include and exclude during the abstraction of quantities.
[edit] Related articles on Designing Buildings Wiki
- Advantages of a bill of quantities.
- Approximate bill of quantities.
- Approximate quantities.
- Bill of quantities breakdown structures BQBS
- Bill of quantities software.
- Bill of quantities v Schedule of rates.
- Common mistakes in bill of quantities.
- How to take off construction works.
- New Rules of Measurement.
- Priced bill of quantities.
- Quantity.
- Standard Method of Measurement SMM7.
- Taking off construction works.
- Types of bill of quantities.
- Unpriced bill.
- Without quantities.
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
38% of Gen Zs feel safe when a fire door is wedged open.
Stunning images from around the world
Shortlist for CIOB’s Art of Building photography competition.
Guidance for conversion of traditional pre-1919 stone buildings.
Industrial heritage in the Ruhr
A marked difference to the fate of industrial landscapes in the UK.
Communities will be able to build their own clean energy.
Why diversity and inclusion matters for SMEs
CIOB’s D&I Charter shows how practical changes can support long-term growth.
Cut electricity bills to power growth
Coalition sends joint letter to the Chancellor.
Gasholders: a history in pictures. Book review.
Recognition, influence and growth
SocEnv identifies three strategic pillars in new strategy to 2045.
Discover the future of roofing, cladding and insulation.
New guidance for professional practice, cultural change and regulation in social housing.
The heritage of nuclear and conventional power stations.